澳门威尼克斯人

      Global Success Stories

      Browse cutting-edge solar projects using TrinaTracker smart tracking solutions.

      tongchuan arrows

      TongChuan China

      LEARN MORE
      Australia arrows

      AustraliaClare

      128MW

      Maximum wind speed level 17

      The main challenge in this project was the wind speed. CLARE Solar Farm is located in Region C, this is a Cyclonic Region in Australia with 212 km/h (58,88 m/s) wind speed. The other critical issue was the ground composed by expansive clays with an active layer of 2 m in depth.

      Huanghe arrows

      ChinaHuanghe Hydropower

      477MW

      Gobi desert

      Huanghe 477MW EHV Project faced the challenge of logistic due to COVID-19 which greatly increased the risk of delivery delay. To meet the original COD deadline, the extra shipping time was required. The solution of this pressure was real-time logistic tracking and adding 3 logistics suppliers.

      Jordan arrows

      JordanFALCON

      23MW

      Uneven terrain

      Terrain slopes even higher than 20%, which required a customized mounting solution, adjusting the tables to the contour of the terrain with the purpose of reducing earth movements. In addition, fixed structure was designed for an allowable wind speed of 145mph (hurricane zone).

      spain arrows

      SpainCobra Solar Park

      190MW

      Mountain and hilly area

      United States arrows

      United StatesGrasshoper

      103MW

      Uneven terrain

      Chile arrows

      ChileCapricornio

      100MW

      Hot and humid area

      友情链接: