• 澳门威尼克斯人

    Global Success Stories

    Browse cutting-edge solar projects using TrinaTracker smart tracking solutions.

    tongchuan arrows

    TongChuan China

    LEARN MORE
    Australia arrows

    AustraliaClare

    128MW

    Maximum wind speed level 17

    The main challenge in this project was the wind speed. CLARE Solar Farm is located in Region C, this is a Cyclonic Region in Australia with 212 km/h (58,88 m/s) wind speed. The other critical issue was the ground composed by expansive clays with an active layer of 2 m in depth.

    Huanghe arrows

    ChinaHuanghe Hydropower

    477MW

    Gobi desert

    Huanghe 477MW EHV Project faced the challenge of logistic due to COVID-19 which greatly increased the risk of delivery delay. To meet the original COD deadline, the extra shipping time was required. The solution of this pressure was real-time logistic tracking and adding 3 logistics suppliers.

    Jordan arrows

    JordanFALCON

    23MW

    Uneven terrain

    Terrain slopes even higher than 20%, which required a customized mounting solution, adjusting the tables to the contour of the terrain with the purpose of reducing earth movements. In addition, fixed structure was designed for an allowable wind speed of 145mph (hurricane zone).

    spain arrows

    SpainCobra Solar Park

    190MW

    Mountain and hilly area

    United States arrows

    United StatesGrasshoper

    103MW

    Uneven terrain

    Chile arrows

    ChileCapricornio

    100MW

    Hot and humid area

    友情链接: